Wednesday, December 24, 2008

24th December 2008


Rained heavily since 4am.

The ground was very soft, my boot got stuck in the mud.

Concrete pouring into Beams B1 to B11 of the auditorium lecture theatre, and pile caps at .....
3 lorry loads of premix concrete from Pertama



reinforcements cleaned before concreting.

Tuesday, December 23, 2008

23rd December 2008

Check reinforcement at B1 to B11 of the auditorium lecture hall ground beams. All reinforcements have to be straightened.

Went to Pertama Mixed Concrete to do tests on 3 cubes.

Recheck reinforcements at B1 to B11 before they are allowed to do concreting.

Monday, December 22, 2008

22nd December 2008

Checked piling of crane tower.

Checked cutting off piles from location ....

Checked BM levels for Beams B1 to B11.

Wednesday, December 17, 2008

17th December 2009

Not much going on , same as yesterday.

Received briefing on piling works and pile testing.

Use load test and PDA test

Tuesday, December 16, 2008

16th December 2008

Visit site

top level checked reinforcement